Research on approaches manages total float of activities by network diagram for project management
Abstract
Tóm tắt
Article Details
References
Bùi Ngọc Toàn, 2008. Chương 3: Lập và quản lí tiến độ sản xuất xây dựng theo sơ đồ mạng. In: TS. Bùi Ngọc Toàn (Chủ biên). Quản lí dự án xây dựng. Nhà xuất bản Giao thông Vận tải, Hà Nội, trang 496-497.
Pasiphol, S. and Popescu, C.M., 1995. Total Float Management in CPM Project Scheduling. In Proceedings, 39th AACE International Annual, American Association of Cost Engineers, June 25-28, 1995. St. Louis, MO. The U.S. state of Missouri. pp. C&SM/C.5.1-C.5.5.
Al-Gahtani, K. S. 2006. A comprehensive construction delay analysis technique - Enhanced with a float ownership concept. Ph.D Dissertation, State University of New York at Buffalo, Buffalo, New York.
Zack, J. G., Jr. 1992. Schedule ‘games’ people play, and some suggested ‘remedies’. Journal of Construction Engineering and Management, 82, 138–152.
Zack, J. G. 1996. Specifying modern schedule management. Construction. Specifier, 498, 42–48.
Arditi, D., and Pattanakitchamroon, T. 2006. Selecting a delay analysis method in resolving construction claims. International Journal of Project Management, 24(2), 145–155.
Prateapusanond, A. 2004. A comprehensive practice of total float preallocation and management for the application of a CPM-based construction contract. Ph.D. Dissertation, Virginia Polytechnic Institute and State University, Blacksburg, Va.
De La Garza, J. M., Vorster, M. C., and Parvin, C. M. 1991. Total float traded as commodity. Journal of Construction Engineering and Management, 1174, 716–727.
Ponce de Leon, G. 1986. Float ownership: Specs treatment. Cost Engineer, 2810, 12–15.
Householder, J. L., and Rutland, H. E. 1990. Who owns float?. Journal of Construction Engineering and Management, 1161, 130–133.
Pasiphol, S., and Popescu, C. 1994. Qualitative criteria combination for total float distribution. Transactions of AACE International the Association for Total Cost Management, pp. DCL3.1– DCL3.6.
Al-Gahtani, K. S. 2009. Float Allocation Using the Total Risk Approach. Journal of Construction Engineering and Management, 1061, 88-95.