Phân tích các kỹ thuật đánh giá chậm trễ tiến độ dự án xây dựng - Ứng dụng thực tế tại dự án Luồng cho tàu biển tải trọng lớn vào sông Hậu
Abstract
Tóm tắt
Article Details
Tài liệu tham khảo
Alkass, S., Mazerolle, M., and Harris, F., 1996. Construction delay analysis techniques. Journal of Construction Management and Economics. 14: 375-394.
Al-Gahtani, K.S., and Mohan, S.B., 2007. Total Float Management for Delay Analysis. Journal of Cost Engineering. 49: 32-37.
Muhanad, A.O., 2011. Integrated Forensic Delay Analysis Framework for Construction Projects –Time and Cost Perspectives, in The Department of Building, Civil and Environmental Engineering, Concordia University, Montreal, Quebec, Canada.
Mohan, S.B., and Al-Gahtani, K.S., 2006. Current Delay Analysis Techniques and Improvements. Journal of Cost Engineering. 48: 12-21.
Yang, J.B., and Kao, C.K., 2009. Review of delay analysis methods: A process-based comparison. Open Construction and Building Technology Journal. 3: 81-89.
Nguyen Duy Long, Stephen Ogunlana, Truong Quang, Ka Chi Lam, 2004. Large construction projects in developing countries: a case study from Vietnam. International Journal of Project Management. 22: 553–561.
Van Truong Luu, Soo-Yong Kim, Nguyen Van Tuan, StephenO. Ogunlana, 2008. Quantifying schedule risk in construction projects using Bayesian belief networks. International Journal of Project Management. 27: 39–50.
Yang, J.B., and Kao, C.K., 2012. Critical path effect based delay analysis method for construction projects. International Journal of Project Management. 30: 385-397.
Al-Gahtani, K.S., 2006. A comprehensive construction delay analysis technique: Enhanced with a float ownership concept, State University of New York at Buffalo: Ann Arbor. p. 387-387 p.
Nguyen, L., and Ibbs, W., 2008. FLORA: New Forensic Schedule Analysis Technique. Journal of Construction Engineering and Management. 134: 483-491.
Lee, H. S., Ryu, H. G., Yu, J. H., and Kim, J. J., 2005. Method for Calculating Schedule Delay Considering Lost Productivity. Journal of Construction Engineering and Management. 131: 1147-1154.
Farrow, T., 2007. Developments in the Analysis of Extensions of Time. Journal of Professional Issues in Engineering Education and Practice. 133: 218-228.
Ng, S.T., Skitmore, M., Deng, M. Z. M., and Nadeem, A., 2004. Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation. 4: 3-17.
Hegazy, T., and Zhang, K., 2005. Daily Windows Delay Analysis. Journal of Construction Engineering and Management. 131: 505-512.
Trương Ngọc Tường, 2009. ĐBSCL mong chờ luồng mới qua kênh Quan Chánh Bố, theo http://portcoast.com/default.asp?id=news103.
Trauner, T.J., 1990. Construction Delays: Documenting Causes, Winning Claims, Recovering Costs. R.S. Means Company. 200.
Kraiem, Z., and Diekmann, J., 1987. Concurrent Delays in Construction Projects. Journal of Construction Engineering and Management. 113: 591-602.
Vo Minh Huy, 2015. Improving Total Float Management Approach for Delay Claims Preparation: Intergating Time and Cost Perpecstives, Master Thesis, National Central University, Taiwan.
Võ Minh Huy, Nguyễn Thanh Tâm, 2016. Nghiên cứu các phương pháp quản lý thời gian dự trữ của công việc bằng sơ đồ mạng trong quản lý dự án, Tạp chí Khoa học, Đại học Cần Thơ. 43a: 93-101.